Review of Project documents like, Contract Documents, IFC and Typical Installation drawings, Material
Specifications and materials availability and planning three months ahead before starting site activities.
Supervised & monitored subcontractors site activities as per Aramco Electrical & HSE standards that
involved installation of process area equipments like LV Power & Lighting Panels, Welding Receptacles,
Earthling Rods and Cables, UG PVC Conduits, Cable Trays, Power & Control Cables, Cathodic Protection
Rectifiers for Tanks, UG anodes for pipes and test point stations, Motors control units (LCS), Lighting
fixtures and conduits, Flood & Lighting poles & JBs etc.
Monitored Inventory items both local purchased and to be delivered by vendors or OEMs to proper
utilize Time, Manpower, Machinery for planned progress.
Electrical material Take-off (MTO) and physical quantity check in warehouse to avoid re-ordering and
non-inspected or rejected materials by inspection department.
Highlighted issues and changes as per site conditions to Field design engineers in order to make
changes in IFC drawings, and check materials stock in case of new installations.
Coordinated with internal inspection QC for proper work completion and to raise RFIs.
Attended E&I Project Mechanical Completion (PMCC) meetings both with internal
managers and with SAUDI ARAMCO PMTs and Managers and achieved targets to close
punch items.
Reviewed subcontractors monthly BOMs and submitted to Construction Manager.
Prepared daily & weekly Construction activity reports for managers & planning department.
Proficient in using of MS Office, Outlook and basic knowledge of Primavera P6, AutoCAD 2D,
Bluebeam Revu, SAP MM ERP End user.
TECHNICON Enterprises which is a multi-discipline Company, has in its fold the experience and background of
sophisticated construction technology, it has successfully completed diverse and complex projects such as
Industrial Plants, Hydel Power Stations, Thermal Power Plants, Energy Resources Projects, Applied Research,
Highway Bridges, Heavy Steel Structures, Off-Shore/On-Shore RCC Pilling and stadiums etc.
As an Electrical Site Engineer my responsibilities were involving material procurement for construction
activities from local vendors as well as assisting mechanical & electrical managers for purchasing Electrical
and mechanical parts of pre-installed Generators from OEMs and local vendors.
Moreover the key responsibilities involved were site surveillance along with internal QC and monitoring and
expediting planned electrical activities and submission of weekly and monthly progress reports to
construction managers. Also ensured all the works performed as per safety standards.
SK Engineering & Construction is world class Engineering, Procurement and Construction
Company that provides total EPC solutions to both the Offshore and Onshore Oil & Gas sector.
It also provides fabrication, installation and commissioning to project owners and operators.
As an Electrical Supervisor my duties were to manage multiple sub-contractors electrical construction
activities at multiple processing areas (INLET, HDO, FGRU and MEG), assisting field design engineers to draft
as built drawings as per site changing conditions, coordinating with other disciplines to encounter interface
issues.
Following Saudi Aramco standards like SAES-P-111,123,100, NEMA VE-02 etc. for Grounding, Lighting, Cable
Trays, Power and Cathodic protection systems for UG Pipes and Tanks.
Rectification of PMCC punch items and coordinating with QC for submission RFIs for closure of items in
Aramco system. Till the end of Wasit Gas Plant Construction project involved in Electrical meetings and
updated MOM files as per discussions and agreements between company and subcontractors.
Gadoon Textile Mills Limited (GTML) is one of the largest spinning unit of Pakistan, primarily concerned with
fiber spinning and knitting. Gadoon is a pioneer of quality and innovation in the textile manufacturing sector
of Pakistan. With an installed capacity of 342,420 spindles operated by independent production units backed
by a captive power plant capacity of 56 megawatts.
As a Junior Electrical Engineer my duties were prepare required material lists of Electrical and mechanical
Generators items and ordering quotations from local vendors and OEMs and preparing cost comparatives
for final orders, plan work method statements of plant, submission progress reports of daily maintenance
activities to Electrical Manager.
Also being part of maintenance team involved in routine overhauling of 19 total Gas and Furnace Generators
with generating capacity of 56 megawatts. Daily Load check of Rotating Auxiliaries and operational tests of
RTD, PT100, Pressure and Limit Sensors and switches.
With collaboration of Orient Energy Systems in year 2011-2012, involved in erection and Commissioning of
two Jenbacher Model J620 E& F Natural Gas Gensets of 3.3 MW, carried out Power and Control Cables
Laying, Routing, Tagging, Termination and Tests of Gensets Auxiliaries.